The Archives
For ease of use, our archives are arranged chronologically.
To find articles on a patricular subject use the search function
for a complete listing of related stories.
July, 2010
Rail Grinding Strategy
Successful Grinding: Starting with the Basics
(Part 2 of 2)
Rail Grinding on Union Pacific
A Measured Approach to Improvements in Rail Grinding
Wheel/Rail Interaction on Transits
Engineering the Wheel/Rail Interface for Rail Transit
January, 2010
Rail Grinding Strategy
Successful Grinding: Starting with the Basics
(Part 1 of 2)
Wheel/Rail Interface Management
Management of the Wheel/Rail Contact Interface in Heavy-Haul Operations
(Part 2 of 2)
October, 2009
Wheel/Rail Interface Management
Management of the Wheel/Rail Contact Interface in Heavy-Haul Operations
(Part 1 of 2)
Rail Materials
What Kind of Rail Materials Will Survive in Heavy-Haul Service?
(Part 2 of 2)
July, 2009
Stress Reduction
Reducing the Stress State on Canadian Pacific’s Western Corridor
Rail Materials
What Kind of Rail Materials Will Survive in Heavy-Haul Service?
(Part 1 of 2)
April, 2009
Performance-Based Assessment
Using Performance-Based Assessment of Reserve Gauge Strength to Enhance Tie-Replacement Planning
DOWNLOAD THIS FEATURE AS PDF FILE (3.01 MEG)
Contact Mechanics and Rail Stresses
Understanding the Effects of Track Gauge, Wheel/Rail Geometry and Friction on Stresses at the Wheel/Rail Interface
TTCI Technology Overview
Meeting the Industry’s Technology Goals
January, 2009
Rail Cant
Rail Cant Measurement of Concrete Crossties (part 2 of 2)
Rail Seat Abrasion
Rail Seat Abrasion: In-Track Repair
October, 2008
WRI '08 Seminar Overview
Wheel/Rail Interaction ’08: Data to Information (part 2 of 2)
Curving Resistance
Assessing the Effects of Coupler Force and Train Speed on Freight Car Curving Resistance
Rail Cant
Rail Cant Measurement of Concrete Crossties (part 1 of 2)
Out-Of-Round Wheels
Identifying Causes of Out-of-Round Wheels: Measuring Field Experience Against Simulations
July, 2008
WRI '08 Seminar Overview
Wheel/Rail Interaction ’08: Data to Information (part 1 of 2)
Rail Grinding
Target Profiles for Rail Grinding: A Never Ending Story
Technology
Implementing Wheel/Rail Measurement and Analysis Technology
Mass-Spring Systems
Using High-Performance Mass-Spring-Systems to Reduce Noise and Vibration in Track
April, 2008
Friction Modification
Top of Rail Friction Modification in Tough Terrain
Reducing Derailments (part 2 of 2)
Reducing Broken Rail Derailments in Dark Territory
124-Pound Rail
Examining 124-Pound Rail
Quality Concepts (part 3 of 3)
Applying Quality Concepts to the Wheel/Rail Interface
January, 2008
Reducing Derailments (part 1 of 2)
Reducing Broken Rail Derailments in Dark Territory
Rail Transit
Managing Wheel/Rail Interaction on Rail Transit Systems
Wheel/Rail Strategies (part 2 of 2)
Wheel Re-Profiling and Rail Grinding Strategies on Wiener Linien
Quality Concepts (part 2 of 3)
Applying Quality Concepts to the Wheel/Rail Interface
October, 2007
Quality Concepts (part 1 of 3)
Applying Quality Concepts to the Wheel/Rail Interface
Suspension Imbalance (part 2 of 2)
Effects of Secondary Suspension Imbalance on Wheel-Climb Derailment
Wheel/Rail Strategies (part 1 of 2)
Wheel Re-Profiling and Rail Grinding Strategies on Wiener Linien
Girder Rail
Testing Girder Rail on the MBTA
July, 2007
Wheel/Rail Interaction
Tuning in to the Systems Approach
Interface Optimization
Tools and Techniques for Optimizing the Wheel/Rail Interface
Suspension Imbalance (part 1 of 2)
Effects of Secondary Suspension Imbalance on Wheel-Climb Potential
Rail Grinding
Specification and Documentation of Rail Grinding Work in Europe
April, 2007
Wayside Load Detection (part 2 of 2)
Using Wayside Load Detectors for Preventive Vehicle Maintenance
Rail Stresses (part 2 of 2)
Understanding Stresses in Rails
Rail Profile Optimization
Profile Optimization in the Urban Rail Context
January, 2007
Wayside Load Detection (part 1 of 2)
Using Wayside Load Detectors for Preventive Vehicle Maintenance
Rail Stresses (part 1 of 2)
Understanding Stresses in Rails
Maintenance Rules
New AAR Maintenance Rules for Freight Car Trucks
Friction Control
Controlling Friction on Rail Transit Systems
Wheel Noise
Tuning Mass Dampers to Reduce Squeal
October, 2006
Derailment Prevention (part 2 of 2)
Inspection and Analysis of Switch Derailments
July, 2006
Grinding Quality Index
Using Real Time Quality Control to Manage Rail Grinding
TOR Friction Control
Quantifying the Benefits of Top of Rail Friction Control
Specialized Grinding
Economic and Operational Benefits of Rail Grinding on the MBTA Green Line
Coverage of the Interface/ARM 12th annual whel/rail interaction seminar
Using Wayside Load Detectors for Preventive Vehicle Maintenance
Derailment Prevention (part 1 of 2)
Switch Point Derailments: Is it the point or the wheel?
March, 2006
Low-Floor Vehicles
Introducing Low-Floor Vehicles into Older Transit Systems
Vehicle Testing
Testing Railway Vehicles to Improve Vehicle/Track Interaction
Book Review: Rail Grinding
The What, Where, Why and How of Rail Grinding
Heavy Axle Loads
How heavy can freight cars get? (Reprinted courtesy of TRAINS)
January, 2006
Curve Superelevation
Curve Superelevation: Problems and Solutions
October, 2005
High Cant Deficiency
Operating at High Cant Deficiency
Truck Bolster Bowl
The truck bolster bowl: Is it a bowl or a bearing?
Seasonal Low-Adhesion
Addressing Seasonal Low-Adhesion Issues
Wheel Shelling
Implementing an Anti-Shelling Wheel Profile
July, 2005
Constant Contact Side Bearings
Making the Case for Long Travel Constant Contact Side Bearings
Wayside Detection Systems
Wayside Detection Systems Move to the Forefront of the Stress State Landscape
May, 2005
FRA R&D
FRA Initiatives: Dr. Magdy El-Sibaie, Chief of FRA's Track Research Division
April, 2005
Specialized Grinding
Specialized Rail Profile Grinding on MBTA
Practical Rail Grinding
Practical Rail Grinding
Side Bearings
Vehicle Side
Bearings: Function, Performance and Maintenance
(Part 2 of 2)
March, 2005
Side Bearings
Vehicle Side Bearings: Function, Performance and Maintenance
(Part 1 of 2)
Track Buckles
Preventing Track Buckles
February, 2005
Rock and Roll
Rock 'til You Drop: Starting and Stopping Harmonic Rock and Roll
Friction Control
Drilling Down to Top-of-Rail Friction
January, 2005
Noise and Vibration
Reducing Noise and Vibration on
NYCT
Rail Fixation Reduces Vibration
Wide Gauge
Effects of Wide
Gauge on Derailment Potential (Part 2 of 2)
December, 2004
Flange Climb
Flange
Climb and Independently Rotating
Wheels
Wide Gauge
Effects of Wide
Gauge on Derailment Potential (Part 1 of 2)
Monitoring and Detection
Designing Amtrak's Wayside Train/Track Interaction Detection System
October, 2004
Rail Transit
Examining wheel/rail interaction
on rail transit systems
Truck Warp
Truck
Warp: Causes and Cures (Part 2 of 2)
see Truck Warp Part 1 in the September
2004 archive below
September, 2004
Optimization
Optimizing Wheel and
Rail Profiles on Amtrak's Northeast Corridor
Asset Management
Developing
an Enterprise Asset Management System for Amtrak’s Northeast
Corridor
Truck
Warp
Truck Warp:
Causes and Cures (Part
1 of 2)
see Truck Warp Part 2 in the October
2004 archive above
August, 2004
Friction Control
Controlling Top-of-Rail Friction
July, 2004
Rail Cant (Spanish version CLICK HERE)
Effects of Rail
Cant on Wheel/Rail Forces and Derailment Potential
Track
Geometry
Moving from Exception-
to Performance-based Track Geometry Monitoring
Systems
Network
Rail
Transitioning from
Reactive to Proactive Track Management on Network
Rail
Grinding
The European Approach
to Quality Control in Rail Grinding
Vehicle
Suspension
Improving Truck Designs
to Reduce Forces Transmitted to Track
Design
Considerations to Meet the M976 Specification
Finance
Wheeling and Dealing
|
The Interface Archives
are presented by:
OFFICIAL
SPONSOR |
|
|